BMTC Route 401-AK ABG-PSS — Abbigere to Peenya 2nd stage
Abbigere to Peenya 2nd stage
BMTC Bus Timings & Stops
Route 401-AK ABG-PSS — Key Facts
Updated 18 Oct 2026- Route number
- 401-AK ABG-PSS
- Origin
- Abbigere
- Destination
- Peenya 2nd Stage
- Total stops
- 19
- Daily pass
- ₹95
- Monthly pass
- ₹1,400
- Trips per day
- 1
- Service type
- Ordinary Bus
- First bus
- 9:10 PM
- Last bus
- 9:10 PM
schedule Schedule & Timings ▼
21:10
Stop-by-Stop Sequence
19 total stops
11
Jalahalli Cross
🚇 Details
▼
Jalahalli Cross bus stop is at the Jalahalli Cross junction on Tumakuru Road (NH 48) in north-west Bengaluru, where Jalahalli Main Road meets the highway near Jalahalli, T Dasarahalli, Peenya and BEL. Major BMTC interchange for the north-west corridor. Connects to Majestic, Yeshwantpur, Peenya, Nelamangala and Yelahanka.
📍 Nearby
- Jalahalli Cross junction — adjacent
- Tumakuru Road (NH 48) — adjacent
- Jalahalli Metro Station — 500 m
- Jalahalli Air Force Station — 1.5 km
- BEL Factory Township — 2 km
- Peenya Industrial Area — 2.5 km
13
TVS Cross Peenya
🚇 Details
▼
TVS Cross Peenya bus stop is at the TVS Cross junction on Tumakuru Road (NH 48) in Peenya, north-west Bengaluru, near the TVS factory, Peenya Industrial Area and Peenya metro station. Connects to Majestic, Yeshwantpur, Jalahalli and Nelamangala.
📍 Nearby
- TVS Cross junction — adjacent
- TVS factory, Peenya — 300 m
- Tumakuru Road (NH 48) — adjacent
- Peenya Industry Metro Station — 1 km
- Peenya Industrial Area — 500 m
15
NTTF Peenya
🚇 Details
▼
NTTF Peenya bus stop is on Tumakuru Road (NH 48) near the NTTF (Nettur Technical Training Foundation) campus in Peenya Industrial Area, north-west Bengaluru. Connects to Majestic, Yeshwantpur, Jalahalli and Nelamangala.
📍 Nearby
- NTTF Peenya campus — adjacent
- Tumakuru Road (NH 48) — adjacent
- Peenya Industrial Area — 500 m
- Peenya Industry Metro Station — 1.2 km
- Peenya TTMC — 1.5 km
19
Peenya 2nd Stage
🚇 Details
▼
Peenya 2nd Stage bus stop is in Peenya 2nd Stage, Peenya Industrial Area, north-west Bengaluru, near Peenya metro station, Peenya TTMC and Tumakuru Road (NH 48). Connects to Majestic, Yeshwantpur, Jalahalli and Nelamangala.
📍 Nearby
- Peenya 2nd Stage — adjacent
- Peenya Industrial Area — adjacent
- Peenya Metro Station — 1.5 km
- Peenya TTMC — 1.5 km
- Tumakuru Road (NH 48) — 1 km
Frequently Asked Questions
Quick answers about BMTC route 401-AK ABG-PSS
What is the route of BMTC bus 401-AK ABG-PSS? ▼
BMTC route 401-AK ABG-PSS runs from Abbigere to Peenya 2nd Stage, covering 19 stops in Bengaluru. Full stop-by-stop sequence is listed above.
How many stops does BMTC route 401-AK ABG-PSS have? ▼
BMTC bus 401-AK ABG-PSS stops at 19 stops between its origin and destination (Peenya 2nd Stage).
Is there a daily or monthly pass for BMTC bus 401-AK ABG-PSS? ▼
Yes — the Ordinary Bus service offers a daily pass of ₹95, a monthly pass of ₹1,400. Passes are valid across all routes of the same service class.
What are the first and last bus timings for BMTC route 401-AK ABG-PSS? ▼
The first BMTC bus on route 401-AK ABG-PSS departs at 9:10 PM and the last bus departs at 9:10 PM.
What are the bus timings for BMTC route 401-AK ABG-PSS? ▼
The scheduled timings for BMTC bus 401-AK ABG-PSS are: 21:10 See the full schedule table above.
How many buses run on BMTC route 401-AK ABG-PSS per day? ▼
BMTC route 401-AK ABG-PSS operates approximately 1 scheduled trips per day between Abbigere and Peenya 2nd Stage.
Other routes to Peenya 2nd Stage
These BMTC buses also stop at this destination.